Hotel Post, Lech

Hochbau Tourismusbauten

Projektdaten

Land
Österreich
Auftraggeber
Hotel Gasthof "Post" GmbH & Co KG
Auftragssumme
-
Ausführungszeitraum
April 2010 - August 2010
Kontakt

Sekretariat Hochbau
+43 5 7181-1690
E-Mail


Extension work and new staff building, a new spa area including indoor pool, an additional wing of bedrooms and a new kitchen.

Two supply tunnels were driven under the existing hotel using conventional methods after demolition and underpinning of the existing structures. Immediately thereafter, a total of six floors in solid construction were built from the lowest level. The construction site was handed over on schedule despite difficult and, in some cases, unforeseeable conditions.