Headrace tunnel Parbati II
Underground Mining Power station construction
Headrace tunnel for Parbati II power plant
Key data
- Country
- India
- Client
- NHPC Ltd.
- Construction method
- mechanical tunnelling
- Contract value
- 7.5 million EUR
- Construction time
- June 2009 - January 2012
- Excavation diameter / cross-section
- 6.80 m