Revitalisation of “die Mühle” (“The mill”), Bludenz
Building Construction General structural engineering
Key data
- Country
- Austria
- Client
- Immobilienprojektmanagement GmbH
- Contract value
- 0.35 Mio EUR
- Construction time
- August 2013 - January 2014
- Contact
Sekretariat Hochbau
+43 5 7181-1690
E-Mail
JÄGER Bau GmbH was commissioned with the adaptation of the former Gunz mill in Bludenz. Various adaptations were envisaged for the reutilisation of the entire site and to inject new life into it. The entire existing building was preserved, also in respect of its properties.