Vianden pumped storage power station
Underground Mining Power station construction
Extension of machine no. 11, Vianden PSPS
Key data
- Country
- Luxembourg
- Client
- Société Elictrique di l'Our S.A. (SEO)
- Construction method
- conventional drive
- Excavation volume
- 250.000 m³
- Contract value
- 75.6 million EUR (as part of a consortium)
- Construction time
- January 2010 - January 2013
- Excavation diameter / cross-section
- 165 - 1.400 m²