Obervermunt reservoir drainage 2011
Key data
- Country
- Client
- Vorarlberger Illwerke AG
- Contract value
- 2.93 Mio EUR
- Construction time
- October 2010 - July 2011
Having been commissioning with the entire set of construction works by the Voralberger Illwerke, JÄGER once again demonstrated its prowess in civil engineering. The intake structure for the future power plant, Obervermunt II, was built in continuous operation.