Obervermunt reservoir drainage 2011

Key data

Country
Client
Vorarlberger Illwerke AG
Contract value
2.93 Mio EUR
Construction time
October 2010 - July 2011

Having been commissioning with the entire set of construction works by the Voralberger Illwerke, JÄGER once again demonstrated its prowess in civil engineering. The intake structure for the future power plant, Obervermunt II, was built in continuous operation.

back to overview