L 95, Silbertaler Strasse, Schruns - Bartholomäberg

Civil Engineering Underground engineering

Key data

Country
Austria
Client
Amt der Vorarlberger Landesregierung
Contract value
2.00 Mio EUR (in ARGE)
Construction time
October 2015 - September 2016
Contact

Sekretariat Tiefbau
+43 5 7181-1690
E-Mail


The bridge known as the Litzbrücke in der Höll, which was built in 1952, was rebuilt. The new Litz bridge was built with an open framework and a flat foundation of reinforced concrete. All traffic had to be redirected single file over a temporary bridge over the Litz river during the demolition of the existing bridge and the construction of its replacement.