Small power plant at Palüdbach, Brand - Expansion of water supply facility BA 06

Civil Engineering Underground engineering

Key data

Country
Austria
Client
municipality Brand
Contract value
2.39 Mio EUR
Construction time
May 2014 - November 2015
Contact

Sekretariat Tiefbau
+43 5 7181-1690
E-Mail


Jäger Bau was awarded the contract for the construction of the small hydro-electric power plants known as "Palüdbach Hochdruck" and "Palüdbach Niederdruck” by the municipality of Brand. At the same time, a source derivation and supply line were constructed for the water supply facility BA 06 belonging to the municipality. Slope corrections were also carried out for the Brandnertal mountain railways.