Small power plant at Palüdbach, Brand - Expansion of water supply facility BA 06
Civil Engineering Underground engineering
Key data
- Country
- Austria
- Client
- municipality Brand
- Contract value
- 2.39 Mio EUR
- Construction time
- May 2014 - November 2015
- Contact
Sekretariat Tiefbau
+43 5 7181-1690
E-Mail
Jäger Bau was awarded the contract for the construction of the small hydro-electric power plants known as "Palüdbach Hochdruck" and "Palüdbach Niederdruck” by the municipality of Brand. At the same time, a source derivation and supply line were constructed for the water supply facility BA 06 belonging to the municipality. Slope corrections were also carried out for the Brandnertal mountain railways.