Hotel Krone, Lech

Building Construction

Key data

Country
Client
Romantikhotel Krone
Contract value
1.2 Mio EUR
Construction time
May 2011 - August 2011
Contact

Sekretariat Hochbau
+43 5 7181-1690
E-Mail


Conversion and extension work at the famous Hotel Krone in Lech was carried out in a very restricted space. The special challenges of this construction site were the limited availability of space and the sensitive excavation location in the immediate proximity of both the river Lech and the main road. The excavation extends 4 m below the existing foundation of this five-star hotel and 2 m below the riverbed. Because of the limited space, the construction crane was placed on the opposite bank of the stream. Special technical expertise, a fair price/performance ratio and JÄGER‘s well-known reliability in meeting deadlines were all decisive in the award of this contract by the Pfefferkorn family.

back to overview