Sägerstrasse Dornbirn

Period of implementation
February 2019 - June 2019
Order sum
700.000 EUR
Project data
Landscape

Hotel Löwen Schruns GmbH - new staff house

Period of implementation
October 2018 - July 2019
Order sum
0,40 Mio EUR
Project data
Landscape

First Mountain Hotel, Gaschurn - new guest houses

Period of implementation
October 2018 - April 2019
Order sum
0,83 Mio EUR
Project data
Landscape

Messehalle 5 new construction, Dornbirn

Period of implementation
June 2018 - December 2018
Order sum
2.5 Mio Eur (as part of a consortium)
Project data
Landscape

Arlberg Resort Klösterle

Period of implementation
June 2018 - December 2019
Order sum
19 Mio. €
Project data
Landscape

MPREIS, St. Gallenkirch

Period of implementation
June 2018 - May 2019
Order sum
2.21 Mio EUR (as part of a consortium)
Project data
Landscape

Residential complex Bludenz VOGEWOSI Unterfeld IV

Period of implementation
June 2018 - August 2018
Project data
Landscape

L 67, Gampelüner Strasse, Nenzing

Period of implementation
March 2018 - May 2018
Order sum
0.11 Mio EUR
Project data
Landscape

Renovation and expansion primary school, Vandans

Period of implementation
March 2018 - July 2018
Order sum
0.98 Mio. EUR
Project data
Landscape

Accompanying road expansion Krüzbühelweg, Bürs

Period of implementation
February 2018 - August 2018
Order sum
0.73 Mio. EUR
Project data
Landscape

Gampadels power station (lower stage) (KGU) - complete renovation, major construction work

Period of implementation
February 2018 - December 2018
Project data
Landscape

Hämmerle Areal, Feldkirch-Gisingen - Residential complex and underground car park

Period of implementation
January 2018 - August 2018
Project data
Landscape

Ivoclar Vivadent Manufacturing GmbH, Bürs - Unit E – FIT 2020

Period of implementation
November 2017 - December 2018
Project data
Landscape

Ivoclar Vivadent Manufacturing GmbH, Bürs - building element D

Period of implementation
September 2017 - December 2018
Project data
Landscape

Residential complex Nüziders VOGEWOSI Mühleweg BA 02

Period of implementation
October 2017 - April 2019
Project data
Landscape

New building Quartier Bündtlitten - Dornbirn

Period of implementation
September 2017 - April 2018
Project data
Landscape

Residential complex St. Gerold VOGEWOSI Faschinastraße

Period of implementation
October 2017 - December 2018
Project data
Landscape

Obervermuntwerk II, loop round around the Silvretta reservoir - extension of west side

Period of implementation
September 2017 - November 2017
Project data
Landscape

Obervermuntwerk II, loop round around the Silvretta reservoir

Period of implementation
August 2017 - April 2018
Order sum
0.54 Mio EUR
Project data
Landscape

Arlberg road tunnel

Period of implementation
April 2017 - October 2017
Order sum
128.0 Mio EUR (in ARGE)
Project data
Landscape

Hotel Traube, Braz - conversion and extension of existing buildings

Period of implementation
April 2017 - December 2017
Project data
Landscape

Rodundwerk I, Latschau reservoir, basin 1 - rehabilitation of basin seal

Period of implementation
April 2017 - September 2017
Project data
Landscape

Hotel Traube, Braz - earth and sewer works

Period of implementation
March 2017 - November 2017
Project data
Landscape

Klösterle water supply system, rehabilitation HB II Danöfen

Period of implementation
March 2017 - November 2018
Order sum
2.30 Mio EUR
Project data
Landscape

Rodundwerk I Latschau, rehabilitation of basin seal

Period of implementation
March 2017 - August 2017
Order sum
2,16 Mio. EUR (in ARGE)
Project data
Landscape

Residential complex Bartholomäberg VOGEWOSI Daneu

Period of implementation
March 2017 - December 2018
Project data
Landscape

Lower Tuxbach water transfer

Period of implementation
February 2017 - January 2019
Order sum
38 Mio EUR (as part of a consortium)
Project data
Landscape

Ferienhotel Fernblick, Batholomäberg - staff housing

Period of implementation
February 2017 - June 2017
Order sum
0.87 Mio EUR
Project data
Landscape

Residential complex Schulgasse, Nüziders

Period of implementation
February 2017 - March 2018
Project data
Landscape

Vorarlberger Landesmuseum, Bregenz

Period of implementation
February 2017 - June 2017
Order sum
5.58 Mio EUR
Project data
Placeholder

Restaurant Kornmesser, Bregenz - Reconstruction barrier-free

Period of implementation
January 2017 - June 2017
Project data
Landscape

Wholesale hall Tschabrun, Bürs

Period of implementation
January 2017 - March 2017
Project data
Landscape

Residential complex VOGEWOSI III, Schruns

Period of implementation
November 2016 - May 2018
Project data
Landscape

AlpinPark Matrei

Period of implementation
October 2016 - November 2017
Project data
Landscape

Schattenlagant Street, Brand

Period of implementation
September 2016 - November 2016
Order sum
0,38 Mio EUR
Project data
Landscape

AlpinLodges Maria Alm

Period of implementation
September 2016 - November 2018
Project data
Landscape

Residential complex Silbertal VOGEWOSI

Period of implementation
August 2016 - September 2017
Project data
Landscape

Bike trail in the area of Zelfen, Tschagguns

Period of implementation
August 2016 - April 2017
Order sum
0.23 Mio EUR
Project data
Landscape

Residential complex Bündtastraße, Vandans

Period of implementation
September 2016 - October 2017
Project data
Landscape

Sewage works - water supply system for Nüziders, Gaschamella district

Period of implementation
July 2016 - October 2016
Order sum
EUR 0.28 Mio EUR
Project data
Landscape

Rentschler Fill Solutions, Rankweil

Period of implementation
August 2016 - November 2017
Order sum
(in ARGE)
Project data
Landscape

State vocational college Dornbirn 1

Period of implementation
May 2016 - October 2016
Order sum
0.70 Mio EUR
Project data
Landscape

Bregenz apartments at the river Ach

Period of implementation
December 2015 - September 2016
Project data
Landscape

Ill-Litz Hof Schruns

Period of implementation
November 2015 - December 2016
Project data
Landscape

ARA Ludesch sewage works

Period of implementation
October 2015 - July 2016
Order sum
1.30 Mio EUR
Project data
Landscape

L 95, Silbertaler Strasse, Schruns - Bartholomäberg

Period of implementation
October 2015 - September 2016
Order sum
2.00 Mio EUR (in ARGE)
Project data
Landscape

Sewer renovation in Gerberstrasse - OK Bludenz

Period of implementation
September 2015 - April 2016
Order sum
1.70 Mio EUR
Project data
Landscape

Getzner plant in Bludenz - Veredelung 2015

Period of implementation
October 2015 - October 2016
Order sum
10,90 Mio EUR (as part of a consortium)
Project data
Landscape

Mansions at Ardetzenberg, Feldkirch

Period of implementation
August 2015 - December 2016
Project data
Landscape

VOGEWOSI, Schruns

Period of implementation
July 2015 - November 2016
Project data
Landscape

Renewal of road and pipeline construction for water supply in Zwischenwasser

Period of implementation
April 2015 - November 2015
Order sum
0.74 Mio EUR
Project data
Landscape

New office building for Doppelmayr, Wolfurt

Period of implementation
March 2015 - August 2016
Order sum
- (as part of a consortium)
Project data
Landscape

Aposelemis tunnel

Period of implementation
March 2015 - November 2017
Order sum
10.0 million EUR
Project data
Landscape

Feldkirch Hospital - New OP wing south

Period of implementation
February 2015 - November 2018
Order sum
7.36 Mio EUR (as part of a consortium)
Project data
Landscape

Bitschnau residential complex, Schruns

Period of implementation
January 2015 - August 2015
Project data
Landscape

Schruns LINDE Apartments residential complex

Period of implementation
January 2015 - December 2015
Project data
Landscape

BTV Conversion Bludenz

Period of implementation
November 2014 - September 2015
Order sum
0.31 Mio EUR
Project data
Landscape

New building yard in Tschagguns - construction phase 01

Period of implementation
October 2014 - May 2015
Project data
Landscape

Steinachstraße residential complex, Bregenz

Period of implementation
September 2014 - December 2015
Project data
Landscape

Tschagguns school sports centre – Renovation and adaptation

Period of implementation
September 2014 - September 2015
Order sum
0.41 Mio EUR
Project data
Landscape

Municipal power plant Inn, Prutz/Ried

Period of implementation
September 2014 - September 2018
Order sum
27.60 Mio EUR (in ARGE)
Project data
Landscape

S 16 Arlberg road tunnel – partial renovation 1 and escape route

Period of implementation
September 2014 - November 2016
Order sum
12.22 Mio EUR
Project data
Landscape

Power plant Heiterwang, Reutte - Rotlechsperre, lower outlet reconstruction

Period of implementation
August 2014 - January 2015
Order sum
0.37 Mio EUR
Project data
Landscape

Propstei St. Gerold - Renovation and extension

Period of implementation
July 2014 - July 2015
Project data
Landscape

Small power plant at Palüdbach, Brand - Expansion of water supply facility BA 06

Period of implementation
May 2014 - November 2015
Order sum
2.39 Mio EUR
Project data
Landscape

Erhart sawmill, Sonntag - new log sorting plant

Period of implementation
April 2014 - July 2014
Project data
Landscape

Municipal office of St. Gallenkirch - conversion

Period of implementation
May 2014 - August 2014
Order sum
0.11 Mio EUR
Project data
Landscape

Obervermuntwerk II, Partenen – energy transport

Period of implementation
May 2014 - October 2017
Order sum
7.10 Mio EUR
Project data
Landscape

STAG washing hall, Bludenz

Period of implementation
April 2014 - December 2014
Project data
Landscape

Kronenwiese residential complex, Schruns

Period of implementation
April 2014 - September 2014
Order sum
1.11 Mio EUR
Project data
Landscape

Vorarlberg Milch, Feldkirch - extension and modification of shop

Period of implementation
March 2014 - May 2014
Order sum
0.16 Mio EUR
Project data
Landscape

Obervermuntwerk II – Infrastructure work

Period of implementation
April 2014 - September 2018
Order sum
10.10 Mio EUR (in ARGE)
Project data
Landscape

Alpine Lodge, Klösterle - Renovation and extension

Period of implementation
March 2014 - November 2014
Order sum
0.51 Mio EUR
Project data
Landscape

OK Götzis, BA 21 - – Sewer overflow tanks

Period of implementation
February 2014 - December 2015
Order sum
3.73 Mio EUR
Project data
Landscape

Wagner, Nüziders - office extension and construction of new pickling bath

Period of implementation
January 2014 - June 2014
Order sum
0.40 Mio EUR
Project data
Landscape

Obervermunt II plant

Period of implementation
January 2014 - January 2017
Order sum
120.0 million EUR (as part of a consortium)
Project data
Landscape

Bludenz | Werdenbergerstrasse residential complex

Period of implementation
October 2013 - December 2014
Project data
Landscape

Extension of workshop for Lins, Nüziders

Period of implementation
September 2013 - November 2013
Order sum
0.44 Mio EUR
Project data
Landscape

Rauch, Nüziders - Extension to company water treatment plant

Period of implementation
August 2013 - November 2013
Order sum
0.47 Mio EUR
Project data
Landscape

Silvretta High Alpine Road - hairpin bends 22 to 23

Period of implementation
September 2013 - September 2014
Order sum
2.56 Mio EUR
Project data
Landscape

Revitalisation of “die Mühle” (“The mill”), Bludenz

Period of implementation
August 2013 - January 2014
Order sum
0.35 Mio EUR
Project data
Landscape

Tschagguns | Flanuf residential complex

Period of implementation
August 2013 - September 2014
Project data
Landscape

Fussach water supply system, BA 11 - Mahd

Period of implementation
July 2013 - October 2013
Order sum
0.25 Mio EUR
Project data
Landscape

Gantner Instruments, Schruns - new building

Period of implementation
April 2013 - September 2013
Order sum
0.50 Mio EUR
Project data
Landscape

OK Bludenz "Mokry" BL 03

Period of implementation
April 2013 - November 2013
Order sum
1.10 Mio EUR
Project data
Landscape

New ski jumping facility, Tschagguns

Period of implementation
March 2013 - October 2013
Order sum
3.74 Mio EUR
Project data
Landscape

The Stern, Fontanella

Period of implementation
March 2013 - March 2014
Project data
Landscape

Raiffeisen residential and commercial building, St. Gallenkirch

Period of implementation
February 2013 - November 2013
Project data
Landscape

Farchant tunnel

Period of implementation
January 2013 - January 2014
Order sum
6.6 million EUR
Project data
Landscape

Headrace tunnel Lünersee injection into core ring

Period of implementation
January 2013 - January 2013
Order sum
0.25 million EUR
Project data
Landscape

FC "Mokry", Bludenz BL 01

Period of implementation
October 2012 - April 2013
Order sum
0.81 Mio EUR
Project data
Landscape

Montforthaus, Feldkirch

Period of implementation
November 2012 - November 2013
Order sum
9.90 Mio EUR (as part of a consortium)
Project data
Landscape

New logistics warehouse, Gebrüder Weiss

Period of implementation
November 2012 - May 2013
Order sum
3.34 Mio EUR
Project data
Landscape

JMK residential and commercial building, Koblach

Period of implementation
September 2012 - December 2013
Project data
Landscape

Builders’ yard and waste materials collection point at Gaschurn

Period of implementation
July 2012 - February 2013
Order sum
1.09 Mio EUR
Project data
Landscape

Collini anodising plant, Hohenems

Period of implementation
July 2012 - February 2013
Order sum
2.67 Mio EUR
Project data
Landscape

L 192, Gargellener Strasse, St. Gallenkirch - Valisera bridge

Period of implementation
June 2012 - November 2012
Order sum
0.71 Mio EUR
Project data
Landscape

Hotel Fernblick, Bartholomäberg - New spa

Period of implementation
April 2012 - July 2012
Project data
Landscape

Birkenwiese care home, Dornbirn

Period of implementation
February 2012 - April 2013
Order sum
4.40 Mio EUR
Project data
Landscape

Butchery Pfleghar, Bludenz

Period of implementation
February 2012 - October 2012
Order sum
0.30 Mio EUR
Project data
Landscape

Läntigen cavern project

Period of implementation
January 2012 - January 2014
Order sum
6.3 Mio EUR
Project data
Landscape

Effolderbacher tunnel

Period of implementation
January 2012 - January 2013
Order sum
3.4 million EUR
Project data
Landscape

Sediment removal Rodund

Period of implementation
November 2011 - May 2018
Order sum
2.70 Mio EUR (as part of a consortium)
Project data
Landscape

VerwallApartments Montafon, Tschagguns

Period of implementation
November 2011 - December 2012
Project data
Landscape

AlpinPark Matrei

Period of implementation
October 2011 - December 2012
Project data
Landscape

Vonach plant, Lauterach

Period of implementation
September 2011 - April 2012
Order sum
0.53 Mio EUR
Project data
Landscape

NB Kronenhaus Bludenz

Period of implementation
October 2011 - October 2012
Project data
Landscape

Kaiserstrasse residential complex, Feldkirch

Period of implementation
October 2011 - December 2012
Project data
Landscape

Design for extension of the Schröcken water supply system 2011

Period of implementation
September 2011 - September 2012
Order sum
0.78 Mio EUR
Project data
Landscape

St. Gallenkirch water supply system, BA 10

Period of implementation
August 2011 - September 2011
Order sum
0.26 Mio EUR
Project data
Landscape

PRIVÀ Alpine Lodge, Switzerland

Period of implementation
August 2011 - June 2013
Project data
Landscape

Flood protection Bludesch - Gais

Period of implementation
July 2011 - November 2013
Order sum
3.00 Mio EUR
Project data
Landscape

New build finishing/incoming goods area, yarn dyeing plant, warehouse, Bludenz

Period of implementation
July 2011 - November 2011
Order sum
4.58 Mio. EUR (as part of a consortium)
Project data
Landscape

road-building Luttweg, Bartholomäberg

Period of implementation
June 2011 - July 2011
Order sum
0.10 Mio EUR
Project data
Landscape

New operations building for Skinfit, Koblach

Period of implementation
July 2011 - May 2012
Order sum
1.40 Mio EUR
Project data
Landscape

Göfis residential complex

Period of implementation
June 2011 - October 2012
Order sum
1.80 Mio EUR
Project data
Landscape

Hotel Krone, Lech

Period of implementation
May 2011 - July 2011
Project data
Landscape

Hotel Krone, Lech

Period of implementation
May 2011 - August 2011
Order sum
1.2 Mio EUR
Project data
Landscape

Office and warehouse space for Klema, Meiningen

Period of implementation
May 2011 - April 2012
Order sum
2.50 Mio EUR
Project data
Landscape

Car park extension in Latschau

Period of implementation
April 2011 - May 2011
Order sum
0.37 Mio EUR
Project data
Landscape

Extension to “Post Gasthof” inn, Dalaas

Period of implementation
May 2011 - November 2011
Order sum
1.90 Mio EUR
Project data
Landscape

Getzner, Bludenz - new fire station

Period of implementation
March 2011 - May 2011
Order sum
0.43 Mio EUR
Project data
Landscape

Rodund power stations I and II Latschau basin

Period of implementation
February 2011 - June 2011
Order sum
3.92 Mio EUR
Project data
Landscape

KAT2 Koralm tunnel

Period of implementation
January 2011 - January 2019
Order sum
570.0 million EUR (as part of a consortium)
Project data
Landscape

Rodundwerk II inlet tunnel

Period of implementation
January 2011 - January 2011
Order sum
1.0 million EUR
Project data
Landscape

Michaelstunnel

Period of implementation
January 2011 - January 2012
Order sum
22.0 million EUR (as part of a consortium)
Project data
Landscape

House access Wettingen

Period of implementation
January 2011 - January 2011
Order sum
0.7 million EUR
Project data
Landscape

Innertkirchen 1 power plant

Period of implementation
January 2011 - January 2015
Order sum
71.0 million CHF (as a part of a consortium)
Project data
Landscape

Samina pumped storage power station

Period of implementation
January 2011 - January 2013
Order sum
5.9 million EUR (as a part of a consortium)
Project data
Landscape

Vorarlberg Museum, Bregenz

Period of implementation
September 2010 - October 2011
Order sum
5.58 Mio EUR (as part of a consortium)
Project data
Landscape

Rungelin residential complex, Bludenz

Period of implementation
October 2010 - September 2011
Order sum
1.85 Mio EUR
Project data
Landscape

Obervermunt reservoir drainage 2011

Period of implementation
October 2010 - July 2011
Order sum
2.93 Mio EUR
Project data
Landscape

8 EUB Palüdbahn, Brand

Period of implementation
August 2010 - August 2010
Project data
Landscape

Rifa stilling basin, storage volume freeboard increase

Period of implementation
August 2010 - May 2011
Order sum
2.44 Mio EUR
Project data
Landscape

Villa W, Vienna

Period of implementation
June 2010 - July 2011
Project data
Landscape

Rehabilition and expansion of the Oberau school center, Feldkirch

Period of implementation
June 2010 - February 2012
Order sum
3.37 Mio EUR
Project data
Landscape

Water supply system Lech - Warth

Period of implementation
June 2010 - July 2011
Order sum
1.30 Mio EUR
Project data
Landscape

Hotel Post, Lech

Period of implementation
March 2010 - August 2010
Project data
Landscape

Vianden pumped storage power station

Period of implementation
January 2010 - January 2013
Order sum
75.6 million EUR (as part of a consortium)
Project data
Landscape

Eierberge tunnel

Period of implementation
January 2010 - January 2013
Order sum
160.0 million EUR (as part of a consortium)
Project data
Landscape

Vermunt exploration shaft

Period of implementation
January 2010 - January 2011
Order sum
1.3 million EUR
Project data
Landscape

Deschlberg Tunnel

Period of implementation
January 2009 - January 2011
Order sum
21.2 million EUR
Project data
Landscape

Saukopf rescue tunnel

Period of implementation
January 2009 - January 2012
Order sum
20.0 million EUR
Project data
Landscape

Headrace tunnel Parbati II

Period of implementation
January 2009 - January 2012
Order sum
7.5 million EUR
Project data
Landscape

Osterberg shaft, Germany

Period of implementation
December 2008 - June 2009
Order sum
0.04 Mio EUR
Project data
Landscape

Osterberg tunnel

Period of implementation
January 2008 - January 2012
Order sum
98.0 million EUR (as part of a consortium)
Project data
Landscape

Sargans cavern, Switzerland

Period of implementation
December 2007 - December 2008
Order sum
6.0 Mio EUR (in ARGE)
Project data
Landscape

Eyholz Tunnel

Period of implementation
January 2007 - January 2015
Order sum
330.0 million EUR (as part of a consortium)
Project data
Landscape

Power plant Parbati III

Period of implementation
January 2006 - January 2011
Order sum
68.4 million EUR (as part of a consortium)
Project data
Landscape

Katzenberg tunnel

Period of implementation
January 2004 - January 2011
Order sum
323.4 million EUR (as part of a consortium)
Project data
Landscape

Paierdorf exploration shaft

Period of implementation
December 2002 - December 2003
Order sum
2.5 Mio EUR
Project data
Landscape

Priva Alpine Lodge Lenzerheide

Period of implementation
-